330-572-7697 info@beckRMG.com

Curtain Wall Grouting

This project, for NASA, required three phases of injection. We stopped the larger leaking cracks with polyurethane injection. Then we injected a curtain wall behind the walls and under the floor to create a complete membrane envelope. The last step was structural crack repair and injection.

Skills

Posted on

November 16, 2022